220kV Substation Automation System Tan-Transco Karmadai Tamilnadu

The existing transmission network is strengthened year after year by establishing new substations, lines and upgrading the existing system to meet the capacity addition in generation and to meet the demand..

SATECH INFRA has executed the work for 2Nos. new bay extention for 220kV substation at Tamil Nadu Transmission Corporation on behalf of Hitachi Energy India as ;

  • GE SCADA development for System Architecture, Network Architecture, SLD, Alarm, Events, Reports etc.
  • Relays/IED’s settings for communication at IEC61850
  • Gateway configuration for data at SLDC.
  • Integration of SCADA with different make IED;s for Control & Monitoring.