BARC/TSD/SAS/NRF SUBSTATION

Dr. Homi Jehangir Bhabha conceived the Nuclear Program in India. Dr Bhabha established the Tata Institute of Fundamental Research (TIFR) for carrying out nuclear science research in 1945. To intensify the effort to exploit nuclear energy for the benefit of the nation, Dr Bhabha established the Atomic Energy Establishment, Trombay (AEET) in January 1954 for multidisciplinary research program essential for the ambitious nuclear program of India. After the sad demise of Bhabha in 1966, AEET was renamed Bhabha Atomic Research Center (BARC).

SATECH has executed the SUBSTATION AUTOMATION SYSTEM (SAS) PROJECT for NRF Substation / BARC Trombay Mumbai   (SITC) of Electrical Power Supply Monitoring system for BARC/TSD/19 project on behalf of Damodhartech international Pvt Ltd.

PROJECT TECHNICAL HIGH LIGHTS

Under This project Electrical Power Monitoring SCADA System was implemented to take care of approx 3000 electrical parameters. The system is designed as per below;

  • Control Center;
    • SCADA comprises of;
      • Server Main & Standby-5000 Tags
      • OPC Server, OPC Client
      • Crystal Report runtime
      • ViewX, Client Licence
      • USB Key
      • Annual Service & Support- 1unit
    • Main & standby Server Panel
      • Main server Machine cum Operator Work Station
      • Standby Machine server cum Operator Work Station
      • Ethernet Fiber switch
      • Line interface unit
      • SMPS
      • Other Components
    • HMI Machine cum Engineering Work Station
    • 21″ Monitors-6Nos
    • 55″ Large video Screen (LVS)
    • A4 Laser Jet Printer
  • Two nos of RTU panels comprises of;
    • Main & Backup Controllers 
    • IO Racks with controller to take care of
      • 1200 ch. Digital inputs
      • 28 ch. Analog inputs
      • 36nos protection relays (Soft Signal)
      • 63nos. MFM (Soft Signal)
    • Line interface Unit
    • SMPS
    • Other components
Note: Each controller comprises of 4nos RS485 port & 2Fx+4Tx and LCD Graphics Display for locally monitoring through controllers

SYSTEM ARCHITECTURE


FOR


NRF SUBSTTION SCADA CONTROL ROOM WITH RTU PANELS

PROJECT STATUS

Project completed on & before time & Handover to customer

Call Now